Friday, November 12, 2010

Log

Log 9
Date: Friday, November 12

In Class: Today, my blog is finally up to date.  All necessary assignments are finally documented on the blog.  Although they are late, a lot of work has been put into them.  Assignments include: Alternative Solutions, Rationale, Testing Procedures and Developmental Work.  In class I also continued working on an AutoCAD drawing of the site layout.  I switched over to Google Sketch Up.  I had some small troubles at first, but then understood the program better.  The developmental work posted as of now consists of hand drawn sketches and power point generated sketches of all solutions that I have designed for each set of specifications and requirements.

At Home: I scanned all of my sketches and posted them onto my blog.  I continue to work on further computer generated developmental work.  

Today is the end of Marking Period 1.     

No comments:

Post a Comment