In Class: Continue working on site drawing. Started using the data collected from the survey we did when we visited the marina site. I have also been using Google SketchUp to complete my drawings. I have to start gathering the other team members designs so that I can put them into my drawing.
Also, Mr. Denko came and visited yesterday. He viewed our drawings and gave us ideas to help make our design as efficient as possible. He told me specifically that M. Ru.'s gas tanks do not need to provide gas to land vehicles. It's main purpose should simply be to get the gas form land to the gas pumps on the dock, where it will fill the water vessels.
Tuesday, November 30, 2010
Tuesday, November 23, 2010
Log
Log 2
Date: Tuesday November 23, 2010
In class: I continue drawing developmental work on google sketch up.
Date: Tuesday November 23, 2010
In class: I continue drawing developmental work on google sketch up.
Wednesday, November 17, 2010
Log
Log 1
Date: Wednesday November 17, 2010
In Class: Today I continued computer generated developmental work on Google Sketch Up. I am continuing research on ecological building materials.
Date: Wednesday November 17, 2010
In Class: Today I continued computer generated developmental work on Google Sketch Up. I am continuing research on ecological building materials.
Friday, November 12, 2010
Log
Log 9
Date: Friday, November 12
In Class: Today, my blog is finally up to date. All necessary assignments are finally documented on the blog. Although they are late, a lot of work has been put into them. Assignments include: Alternative Solutions, Rationale, Testing Procedures and Developmental Work. In class I also continued working on an AutoCAD drawing of the site layout. I switched over to Google Sketch Up. I had some small troubles at first, but then understood the program better. The developmental work posted as of now consists of hand drawn sketches and power point generated sketches of all solutions that I have designed for each set of specifications and requirements.
At Home: I scanned all of my sketches and posted them onto my blog. I continue to work on further computer generated developmental work.
Today is the end of Marking Period 1.
Date: Friday, November 12
In Class: Today, my blog is finally up to date. All necessary assignments are finally documented on the blog. Although they are late, a lot of work has been put into them. Assignments include: Alternative Solutions, Rationale, Testing Procedures and Developmental Work. In class I also continued working on an AutoCAD drawing of the site layout. I switched over to Google Sketch Up. I had some small troubles at first, but then understood the program better. The developmental work posted as of now consists of hand drawn sketches and power point generated sketches of all solutions that I have designed for each set of specifications and requirements.
At Home: I scanned all of my sketches and posted them onto my blog. I continue to work on further computer generated developmental work.
Today is the end of Marking Period 1.
Developmental Work - Hand Drawn and Power Point
Note: Please disregard the solution numbers on the drawings themselves. The correct solution numbers are listed as captions to each drawing.
THE SITE:
SOLUTIONS WITH RESPECT TO 150 SLIP SPEC:
![]() |
| Solution 3 v1 |
![]() |
| Solution 3 v2 |
![]() |
| Solution 3 v2 Landscaping |
![]() |
| Solution 2 v1 |
![]() |
| Solution 2 v2 |
![]() |
| Solution 4 |
![]() |
| Solution 5 |
![]() |
| Solution 6 v1 |
![]() |
| Solution 6 v2 |
![]() |
| Solution 6 v3 |
![]() |
| Solution 6 v4 |
SOLUTIONS WITH RESEPCT TO 300 SLIP SPEC:
![]() |
| Solution 1 v1 |
![]() |
| Solution 1 v2 |
![]() |
| Solution 7 v1 |
![]() |
| Solution 7 v2 |
![]() |
| Solution 8 v1 |
![]() |
| Solution 8 v2 |
![]() |
| Solution 9 v1 |
![]() |
| Solution 9 v2 |
![]() |
| Solution 9 v3 |
SOLUTIONS WITH RESPECT TO 400 SLIP SPEC:
![]() |
| Solution 10 |
![]() |
| Solution 11 |
![]() |
| Solution 12 v1 |
![]() |
| Solution 12 v2 |
![]() |
| Solution 12 v3 |
![]() |
| Solution 12 v4 |
Thursday, November 11, 2010
Rationale Report
SOLTUION DESCRIPTIONS
Alternate Solution 1
This solution is designed with respect to the second set of specification and limitations marketed towards all boat users. This set requires the marina to meet the needs of 300wet slip berthing areas and all size boat ramp users while containing the marina within the specified grounds. The marina is responsible for providing necessary facilities, including general parking, ramp user parking, a boat ramp to be used by boats up to 90 feet in length, restrooms, fuel storage, vessel maintenance and repair area, a café, and the harbormaster’s office. Separate buildings house the vessel repair and bathroom facilities. The café and harbormaster’s office are to use one building jointly. These three buildings are each 30’ x 50’. The fuel storage is a specified 40’ x 60’ area to be designed by the Civil Fuel Storage/Pump Engineer.
Entrance to the marina is provided through the ramp area and general user parking areas. The ramp is located in the southern tip of the site. The staging area is roughly 100’ x 100’. After boats are launched, boaters are able to park their vehicles and trailers in the trailer parking lot northwest of the ramp staging area. This parking lot consists of one one-way aisle and 18 13’ x 40’ stalls. It does not allow for pull through parking stalls. The general parking lots can be entered through an access road on the north edge of the site. Each of these parking lots consists of one continuous two-way aisle. The larger of the lots provides 129 stalls. The smaller lot provides 55 stalls. All stalls are 18.5’ x 9’ and are positioned at 90 degrees to the normal.
The ramp staging area and triangular region encompassing the vessel repair building and fuel storage area are to be paved. The parking lots will be surfaced with broken clam shells.
Alternate Solution 2
This solution is designed with respect to the third set of specifications and limitations marketed toward small boat users. This set requires the marina to meet the needs of 150 wet slip berthing areas and small boat ramp users while containing the marina within the specified grounds. The marina is responsible for providing necessary facilities, including general parking, ramp user parking, a boat ramp to be used by boats up to 24 feet in length, restrooms, fuel storage, vessel maintenance and repair area, a café, and the harbormaster’s office. Separate buildings house the vessel repair, and bathroom facilities. The café and harbormaster’s office are to use one building jointly. These three buildings are each 30’ x 50’. The fuel storage area is only a specified 40’ x 60’ area to be designed by the Civil Fuel Storage/Pump Engineer.
This plan does not emphasize the focal point of the marina but does partake in a circle theme. The main entrance into the marina is the entrance into the general user’s parking lot. This parking lot is a circular access road with general parking along its edges. This road gives access to the ramp staging area located in the northwest corner of the site. After boats are launched, ramp users are able to park their cars in the trailer parking lot just east of the staging area. To pick up boats, ramp users have to exit the ramp parking lot, and reenter the circular access road to access the ramp staging area. This one way flow minimizes confusion and maximizes circulation. They would have to travel again through the trailer parking lot to exit the marina. The fuel storage and vessel maintenance areas are located in the southern tip of the marina. These are accessed and exited only by Hartshorne Drive . The bathroom facilities, café and harbormaster’s office are located in between the circular parking lot and ramp staging area. These two buildings located along the water’s edge do not emphasize the focal point and are not easily accessed by pedestrians.
The circular parking area is 137’ in total radius. The road is 30’ wide. It provides just 95 18.5’ x 9’ parking stalls. The center of the parking lot provides an area of 15,400 square feet to be landscaped. Other landscaping areas include the space between the buildings, ramp, and parking lot areas. The trailer parking lot consists of two one-way aisles and provides 26 13’ x 40’ parking stalls at 120 degrees to the normal.
The ramp staging area is roughly 150’ x 150’. This area along with the fuel storage and vessel repair area will be paved. Both parking lots will be surfaced with broken clam shells.
Alternate Solution 3
This solution is designed with respect to the third set of specifications and limitations marketed toward small boat users. This set requires the marina to meet the needs of 150 wet slip berthing areas and small boat ramp users while containing the marina within the specified grounds. The marina is responsible for providing necessary facilities, including general parking, ramp user parking, a boat ramp to be used by boats up to 24 feet in length, restrooms, fuel storage, vessel maintenance and repair area, a café, and the harbormaster’s office. Separate buildings house the vessel repair, and bathroom facilities. The café and harbormaster’s office are to use one building jointly. These three buildings are each 30’ x 50’. The fuel storage area is only a specified 40’ x 60’ area to be designed by the Civil Fuel Storage/Pump Engineer.
This plan boasts one main entrance to be used by all users. The entrance is located along Hartshorne Drive , 50 feet north of the bend in the road. The entrance leads to a two-way road that directs the user’s attention towards the focal point of the marina – the main circular dock. Upon entering through this entrance into the marina, users are able to immediately turn north into the vessel maintenance repair and fuel area, or travel further west towards to the dock. Upon the end of the road, users can turn right into the non ramp user’s parking lot or left to access the ramp and ramp parking. Ramp users are able to launch their boats from the ramp, and park their cars with attached trailers efficiently within a reasonable amount of proximity. There is an exit behind the ramp staging area for ramp users that have picked up their boats and wish to leave without traveling through a busy parking lot. With this design the flow of traffic is directed generally in two counter clockwise circles that meet at the entrance of the marina. Maintaining one entrance while separating ramp users from non-ramp users will increase ease of use and efficiency.
The general parking lot is a one-way parking lot providing. It provides one entrance and one exit. The trailer parking consists of four one-way aisles directed towards the lot exit. It provides 28 40’ x 13’ stalls.
The ramp area located on the southern most tip of the site along with the fuel storage and vessel maintenance areas are paved in with an impervious surface.
The two buildings located just east of the focal point will house restroom facilities, the café and harbormasters office. They are each 50’ x 30’. These buildings are surrounded by a triangular area of greenery. The greenery is surrounded by a side walk providing entrances to each building, the focal point, and the general parking lot.
SOLUTION PROS AND CONS
This solution maximized available parking stalls, but in doing so limited the feasibility of circulation. The main discrepancy in this design is the lack of flow and the lack of one main entrance. The lack of a main entrance has the potential of confusing users. This is especially possible because of the natural tendency of users to approach the site from the south. When driving from the south, the first entrance in this design is the entrance to the ramp staging area. If general users confuse this entrance with the general entrance then traffic issues will occur. General users can not be found in the same area as vehicles with trailers. Second, the designed trailer parking is not sufficient. The lack of pull parking requires vehicles pulling trailers to back out of the space at an odd angle, possibly causing traffic, accidents and other detrimental happenings.
Overall, there is no flow within the site. The parking lots offer easy in and out access, but no access to other areas of the marina. There are also no adequate traffic patterns for pedestrians and the user’s attention is not directed towards the focal point – the main dock.
This solution dominantly portrays a circle theme, including the parking area and the main dock. It is aesthetically pleasing; however it does not give focus to the decided focal point – the main dock. This circular design of the access road and parking does provide good circulation, it keeps traffic moving. More importantly this design does not provide an adequate amount of parking. Parking is needed to support the needs of marina users. It falls short of the necessary amount. The trailer parking area, on the other hand is efficient. It provides pull through stalls and one way aisles.
This design provides one main entrance clearly designated just north of the bend in Hartshorne Drive . This entrance provides visual clearance and directs users’ attentions to the focal point. This main road also provides access to all distinct regions of the marina – general parking, trailer parking, ramp, facilities, and fuel storage and maintenance. It is a centralized point in the site that offers supreme circulation. It is like the trunk of a tree. Further, the general parking provides a sufficient amount of stalls to support the needs of marina users. The parking lot is in close proximity to docks and facilities. The trailer parking too provides sufficient number of stalls. This parking lot is optimal for trailer use because of pull through stalls, one way aisles, and distinctive one way exits and entrances. This solution has the least amount of impervious surfaces located in close proximity to the water front, helping the ecological sustainability of the site. There is also sufficient space for landscaping and storm water runoff needs.
FINAL SOLUTION
Friday, November 5, 2010
Specifications Analysis Chart
Specifications | (click) | (click) | |
| Structures and systems are built inside allotted land. | 1 | 1 | 0 |
| Permeable materials are used whenever possible to prevent storm water runoff. | 1 | 0 | 1 |
| No more than 40% of the land portion of the marina surface consists of impervious structures and materials. | 1 | 0 | 1 |
| Impervious structures are not located near the water front. | 0 | 0 | 0 |
| Allows for optimal multi-client use. | 0 | 0 | 1 |
| Direct user’s attention toward focal point (round dock). | 0 | 0 | 1 |
| Provides one clearly designated entrance. | 0 | 1 | 1 |
| Provides a minimal of two exits. | 1 | 1 | 1 |
| Traffic circulation is efficient and optimal. | 0 | 0 | 1 |
| Pedestrian circulation is efficient and optimal. | 0 | 0 | 1 |
| Roads and pathways provide transportation to key locations. | 0 | 0 | 1 |
| Road system through out the marina is easily navigable by all users. | 0 | 0 | 1 |
| Provides parking for general users. | 1 | 1 | 1 |
| Provides parking to support the 150 specified wet slips. | 1 | 0 | 1 |
| Provides 5 handicapped accessible stalls. | 1 | 1 | 1 |
| Provides ramp location. | 1 | 1 | 1 |
Provides sufficient ramp turn around area. | 0 | 1 | 1 |
Provides parking for ramp users. | 0 | 1 | 1 |
Provides parking stalls at a minimal length of 40 ft. for cars trailing boats. | 0 | 1 | 1 |
Trailer parking allows for pull through stalls. | 0 | 1 | 1 |
Provides bathroom facilities | 1 | 1 | 1 |
Provides utilities for fuel storage and pump. | 1 | 1 | 1 |
| Provides facility for vessel maintenance and repair. | 1 | 1 | 1 |
| Provides usable and enough square footage for landscaping. | 1 | 0 | 1 |
Total: | 11/24 | 13/24 | 22/24 |
Analysis Chart: The first column lists the specifications and limitations the solutions were designed to. The second, third and fourth columns list the three solutions. The solutions were rated on a 0 to 1 scale - 0 meaning the solution does not meet or entirely meet the specification, 1 meaning the specification is entirely and effieciently met. The highest rating is 24/24 or 100%. The ratings were then totaled. Solution three had the highest rating of 22/24 or 91.67%.
Note: The solution headings at the top of the columns are links to the solution sketches.