Tuesday, November 2, 2010

Log

Log 3
Date: Tuesday, October 12

At Home: Yesterday Monday, October 11 I met with Charles Hopkins and Kirk Danielson of T&M Associates in Middletown to primarily discuss  the practicality of the design project pertaining to my specific task.  It was determined that without a client with specific needs and wants the project is difficult to design.  More importantly it was determined that the specification of 300 wet slips in the given land area is too aggressive and impractical.  To provide parking for 300 wet slips would be detrimental to the flow of traffic.

The following mentor contact was obtained: 
      
Student: Ann Marie Carton
Date: October 11, 2010
Contact: Charles Hopkins, Kirk Danielson
Reference: Meeting to introduce project and preliminary designs, search for guidance
Type: Visit
Questions: I need overall assistance on site planning.  Are the given specs feasible?
Discussion: No, the space given is reasonably small to accommodate so many wetslips.  Need to take into consideration circulation and flow, of vehicular, boat and pedestrian traffic. With the limited space, optimal circulation can not be reached.  Possible down sizing? Trailer parking needs a boat wash area, big loops, no backing up, 13’ x 40’, at 120° to the normal, one-way.  Spots can be delineated with flush concrete curbing.  Other information gained: In today’s society, you no longer need phone lines out on docks, but rather wi-fi. If lamp posts are 20’ high, they need to be 100’ apart.  It would be extremely help if the number of expected visitor’s was known, or if we could consult a client.

During this meeting with T&M Associates I was given the opportunity to see working AutoCAD drawings of the proposed Cover Marina in Brick, NJ.  Kirk Danielson is the project manager of the marina and was able to explain the general structures and systems of this marina. He had worked on a team of 60 educated professionals to complete the final design.  It was of great help to see the design process of a similar project in the real world.

In Class: During lunch Lead structural engineer CC and I proposed to WG a change in specifications.  We determined from thorough research and professional advice that a change in specs is needed yet again to complete the project efficiently.  Previous specs were just unrealistic.  The new specifications were approved.  During class a meeting was conducted with the whole of the Green Marina Team to implement the new specifications.

The proposal is as follows: 

Concerns/Problems
·          300 slips is too large for given land area – not realistic
·          Requires parking which takes up too much space and leaves limited space for everything else
·          Lack of optimal circulation and flow of traffic/pedestrians/boaters

Solutions
·          Increase land size – not realistic

              ~OR~

·          Sandy Hook caters to day-visitors only
·          Beneficial to cater to day-visitors as well, market the marina to people who visit Sandy Hook for day trips– meaning…
·          Limiting the marina to smaller sized boats – smaller than 30 ft. (boats the everyday person hauls on a trailer using their own vehicles, large boats require huge diesel trucks to haul)
1.        day-visitors of Sandy Hook are usually families
2.        smaller boats are more economically feasible to own and use – require less gas, less maintenance, less gas
3.        large boats are expensive, costly to maintain and use
4.        large boat manufacturers are struggling in today’s economy – no one is buying
·          Increasing usage of ramp (for smaller boats up to 24 ft., larger boats require huge trucks and are not hauled in and out of water each day)
1.        requires larger amount of parking for trailers
2.        requires larger staging area to allow multiple boaters use of ramp at same time
·          Decreasing number of slips (to 150)
·          Decreasing slip size to less than 30 ft.
·          Need optimal circulation and flow – especially for large amounts of pedestrians (Sandy Hook sees over 11,000 visitors each day)

  (Upcoming due dates: Model due October 26; redue site layout design for the third time)