Log
Log 8
Date: Wednesday, November 3
In Class: Today I presented my Formal Progress Update. Overall, I thought I did well. Faults included a lack of data to support alternate solutions, and overall nervousness. There were no questions after my presentation. After class, I asked WG and JC if there was any feedback on my designs. The only concerns pertained to fuel storage and the distance it is away from the boat ramp. There are not any viable solutions to this problem at this point in the design process. I also learned that next marking period's construction requires those on the green marina team to produce a working set of drawings or blueprints. The drawings are in a sense our final solution; it is what the client would be given. The larger scale model is only one part of the construction process.
Overall: Everyone on the Green Marina team is finally understanding the extent of the project and their individual tasks. It seems everything is coming together nicely, but still needs minimal revising. I agree that we should have been working more cohesively on the project during the past two months, however we were told that we can work independantly. This has been proven inefficient but it has also been difficult to change the mindset of my team members. Pertaining to the progress of the project being a month late, I can say that extensive research was conducted over the summer. Students went ahead to design solutions assuming the given original specifications and limits were feasible. Only after starting this initial design process was it discovered the given specs and limits were not condusive to the project. More research was needed and conducted accordingly, and the design process was started again. Work and research had to be edited and in some cases duplicated to accomodate these new specs.
Date: Wednesday, November 3
In Class: Today I presented my Formal Progress Update. Overall, I thought I did well. Faults included a lack of data to support alternate solutions, and overall nervousness. There were no questions after my presentation. After class, I asked WG and JC if there was any feedback on my designs. The only concerns pertained to fuel storage and the distance it is away from the boat ramp. There are not any viable solutions to this problem at this point in the design process. I also learned that next marking period's construction requires those on the green marina team to produce a working set of drawings or blueprints. The drawings are in a sense our final solution; it is what the client would be given. The larger scale model is only one part of the construction process.
Overall: Everyone on the Green Marina team is finally understanding the extent of the project and their individual tasks. It seems everything is coming together nicely, but still needs minimal revising. I agree that we should have been working more cohesively on the project during the past two months, however we were told that we can work independantly. This has been proven inefficient but it has also been difficult to change the mindset of my team members. Pertaining to the progress of the project being a month late, I can say that extensive research was conducted over the summer. Students went ahead to design solutions assuming the given original specifications and limits were feasible. Only after starting this initial design process was it discovered the given specs and limits were not condusive to the project. More research was needed and conducted accordingly, and the design process was started again. Work and research had to be edited and in some cases duplicated to accomodate these new specs.
Alternate Solution 3
This solution is designed with respect to the third set of specifications and limitations marketed toward small boat users. This set requires the marina to meet the needs of 150 wet slip berthing areas and small boat ramp users while containing the marina within the specified grounds. The marina is responsible for providing necessary facilities, including general parking, ramp user parking, a boat ramp to be used by boats up to 24 feet in length, restrooms, fuel storage, vessel maintenance and repair area, a café, and the harbormaster’s office. Separate buildings house the vessel repair, and bathroom facilities. The café and harbormaster’s office are to use one building jointly. These three buildings are each 30’ x 50’. The fuel storage area is only a specified 40’ x 60’ area to be designed by the Civil Fuel Storage/Pump Engineer.
This plan boasts one main entrance to be used by all users. The entrance is located along Hartshorne Drive , 50 feet north of the bend in the road. The entrance leads to a two-way road that directs the user’s attention towards the focal point of the marina – the main circular dock. Upon entering through this entrance into the marina, users are able to immediately turn north into the vessel maintenance repair and fuel area, or travel further west towards to the dock. Upon the end of the road, users can turn right into the non ramp user’s parking lot or left to access the ramp and ramp parking. Ramp users are able to launch their boats from the ramp, and park their cars with attached trailers efficiently within a reasonable amount of proximity. There is an exit behind the ramp staging area for ramp users that have picked up their boats and wish to leave without traveling through a busy parking lot. With this design the flow of traffic is directed generally in two counter clockwise circles that meet at the entrance of the marina. Maintaining one entrance while separating ramp users from non-ramp users will increase ease of use and efficiency.
The general parking lot is a one-way parking lot providing. It provides one entrance and one exit. The trailer parking consists of four one-way aisles directed towards the lot exit. It provides 28 40’ x 13’ stalls.
The ramp area located on the southern most tip of the site along with the fuel storage and vessel maintenance areas are paved in with an impervious surface.
The two buildings located just east of the focal point will house restroom facilities, the café and harbormasters office. They are each 50’ x 30’. These buildings are surrounded by a triangular area of greenery. The greenery is surrounded by a side walk providing entrances to each building, the focal point, and the general parking lot.
Alternate Solution 2
This solution is designed with respect to the third set of specifications and limitations marketed toward small boat users. This set requires the marina to meet the needs of 150 wet slip berthing areas and small boat ramp users while containing the marina within the specified grounds. The marina is responsible for providing necessary facilities, including general parking, ramp user parking, a boat ramp to be used by boats up to 24 feet in length, restrooms, fuel storage, vessel maintenance and repair area, a café, and the harbormaster’s office. Separate buildings house the vessel repair, and bathroom facilities. The café and harbormaster’s office are to use one building jointly. These three buildings are each 30’ x 50’. The fuel storage area is only a specified 40’ x 60’ area to be designed by the Civil Fuel Storage/Pump Engineer.
This plan does not emphasize the focal point of the marina but does partake in a circle theme. The main entrance into the marina is the entrance into the general user’s parking lot. This parking lot is a circular access road with general parking along its edges. This road gives access to the ramp staging area located in the northwest corner of the site. After boats are launched, ramp users are able to park their cars in the trailer parking lot just east of the staging area. To pick up boats, ramp users have to exit the ramp parking lot, and reenter the circular access road to access the ramp staging area. This one way flow minimizes confusion and maximizes circulation. They would have to travel again through the trailer parking lot to exit the marina. The fuel storage and vessel maintenance areas are located in the southern tip of the marina. These are accessed and exited only by Hartshorne Drive . The bathroom facilities, café and harbormaster’s office are located in between the circular parking lot and ramp staging area. These two buildings located along the water’s edge do not emphasize the focal point and are not easily accessed by pedestrians.
The circular parking area is 137’ in total radius. The road is 30’ wide. It provides just 95 18.5’ x 9’ parking stalls. The center of the parking lot provides an area of 15,400 square feet to be landscaped. Other landscaping areas include the space between the buildings, ramp, and parking lot areas. The trailer parking lot consists of two one-way aisles and provides 26 13’ x 40’ parking stalls at 120 degrees to the normal.
The ramp staging area is roughly 150’ x 150’. This area along with the fuel storage and vessel repair area will be paved. Both parking lots will be surfaced with broken clam shells.
Log
Log 7
Date: Friday, October 29
In Class: Revised Brainstorming&Research and Specifications&Limitations blog entries yesterday.
At Home: Began work on testing procedures. Conducted research related to users. Found an assessment of boater needs. URL : //www.rco.wa.gov/documents/rcfb/boating/Data_Compendium.pdf
(Upcoming due dates: Formal Progress Update Presentations November 1-3)
Date: Friday, October 29
In Class: Revised Brainstorming&Research and Specifications&Limitations blog entries yesterday.
At Home: Began work on testing procedures. Conducted research related to users. Found an assessment of boater needs. URL : //www.rco.wa.gov/documents/rcfb/boating/Data_Compendium.pdf
(Upcoming due dates: Formal Progress Update Presentations November 1-3)
Log
Log 6
Date: Wednesday, October 27
In Class: Yesterday October 26, models of chosen final solutions were presented. I learned information that is pertinent to my final solution. The fuel tanks need an area of 45 ft. by 60 ft. but a roof area about half that size. There will be two 10,000 gallon fuel tanks. It also needs to be an island. The boat ramp extends 100 ft. into the water and is 125 ft. wide. The site will need to extended another 25 ft. to the south to accomodate the ramp. There will be one wind turbine, 29 ft. tall, an area has yet to be determined to place this turbine.
At Home: Revised model to accomodate fuel pumps and the boat ramp. Continued work on final solution and rationale. Conducted research on example landscape layouts to assist AB (Landscape Engineer). Provided AB with example pictures and a website with further information. (http://water.epa.gov/polwaste/green/stormwater_hq_index.cfm)
(Upcoming due dates: Formal Progress Update Outine due October 29; Formal Progress Update Presentation November 1)
Date: Wednesday, October 27
In Class: Yesterday October 26, models of chosen final solutions were presented. I learned information that is pertinent to my final solution. The fuel tanks need an area of 45 ft. by 60 ft. but a roof area about half that size. There will be two 10,000 gallon fuel tanks. It also needs to be an island. The boat ramp extends 100 ft. into the water and is 125 ft. wide. The site will need to extended another 25 ft. to the south to accomodate the ramp. There will be one wind turbine, 29 ft. tall, an area has yet to be determined to place this turbine.
At Home: Revised model to accomodate fuel pumps and the boat ramp. Continued work on final solution and rationale. Conducted research on example landscape layouts to assist AB (Landscape Engineer). Provided AB with example pictures and a website with further information. (http://water.epa.gov/polwaste/green/stormwater_hq_index.cfm)
(Upcoming due dates: Formal Progress Update Outine due October 29; Formal Progress Update Presentation November 1)
Tuesday, November 2, 2010
Log
Log 5
Date: Tuesday, October 19
In Class: Absent from class today due to NHS field trip. Continuing sketches of alternate solutions.
At Home: Over the weekend, conducted research on possible wastewater treatment systems to be used on the marina site. Further research included possible pollution susceptibility of the surrounding tidal embayment. Possible treatment systems include the Oil Trap Treatment System, Multi-pahse Extraction Systems, and electrocoagulation technology. Continued construction of model due October 26.
I feel as if I am falling behind although I still continue to work aggressively on this project. There is so much information to obtain in such a little time. By working on this project, it is noticed that a lack of enthusiasm from team members, a lack of aid, and a lack of coordination between team members contributes significantly to the slow progress of the project as a whole. A simple increase in communication between team members would be beneficial to all. If the Green Marina team worked as a team, not individually, the overall design process would prove to be more cohesive. All team members suffer set backs when a design or solution is created that does not fit with the other components of the marina. If we consulted with each other throughout the process, utilized class time to have weekly or bi-weekly meetings, and obtained constructive feedback from team members and possibly teachers, I believe the project as a whole would be of a greater quality. Members would gain knowledge and be able to better understand what their specific tasks encompass. Team members would not only have a greater interest in the project, but care about the project's results - not just their individual grades.
(Upcoming due date: Model due October 26; Formal Progress Update Outline due October 29)
Date: Tuesday, October 19
In Class: Absent from class today due to NHS field trip. Continuing sketches of alternate solutions.
At Home: Over the weekend, conducted research on possible wastewater treatment systems to be used on the marina site. Further research included possible pollution susceptibility of the surrounding tidal embayment. Possible treatment systems include the Oil Trap Treatment System, Multi-pahse Extraction Systems, and electrocoagulation technology. Continued construction of model due October 26.
I feel as if I am falling behind although I still continue to work aggressively on this project. There is so much information to obtain in such a little time. By working on this project, it is noticed that a lack of enthusiasm from team members, a lack of aid, and a lack of coordination between team members contributes significantly to the slow progress of the project as a whole. A simple increase in communication between team members would be beneficial to all. If the Green Marina team worked as a team, not individually, the overall design process would prove to be more cohesive. All team members suffer set backs when a design or solution is created that does not fit with the other components of the marina. If we consulted with each other throughout the process, utilized class time to have weekly or bi-weekly meetings, and obtained constructive feedback from team members and possibly teachers, I believe the project as a whole would be of a greater quality. Members would gain knowledge and be able to better understand what their specific tasks encompass. Team members would not only have a greater interest in the project, but care about the project's results - not just their individual grades.
(Upcoming due date: Model due October 26; Formal Progress Update Outline due October 29)
Log
Log 4
Date: Friday, October 15
In Class: Work is being continued on alternate solutions pertaining to the new specifications as devised on Tuesday, October 12.
At Home: To do - begin construction of model. I need to conduct further research on the size and dimensions of buildings, e.g. bathroom facilities, cafe, harbormaster office.
Date: Friday, October 15
In Class: Work is being continued on alternate solutions pertaining to the new specifications as devised on Tuesday, October 12.
At Home: To do - begin construction of model. I need to conduct further research on the size and dimensions of buildings, e.g. bathroom facilities, cafe, harbormaster office.
Log
Log 3
Date: Tuesday, October 12
At Home: Yesterday Monday, October 11 I met with Charles Hopkins and Kirk Danielson of T&M Associates in Middletown to primarily discuss the practicality of the design project pertaining to my specific task. It was determined that without a client with specific needs and wants the project is difficult to design. More importantly it was determined that the specification of 300 wet slips in the given land area is too aggressive and impractical. To provide parking for 300 wet slips would be detrimental to the flow of traffic.
The following mentor contact was obtained:
Date: Tuesday, October 12
At Home: Yesterday Monday, October 11 I met with Charles Hopkins and Kirk Danielson of T&M Associates in Middletown to primarily discuss the practicality of the design project pertaining to my specific task. It was determined that without a client with specific needs and wants the project is difficult to design. More importantly it was determined that the specification of 300 wet slips in the given land area is too aggressive and impractical. To provide parking for 300 wet slips would be detrimental to the flow of traffic.
The following mentor contact was obtained:
Student: Ann Marie Carton
Date: October 11, 2010
Contact: Charles Hopkins, Kirk Danielson
Reference: Meeting to introduce project and preliminary designs, search for guidance
Type: Visit
Questions: I need overall assistance on site planning. Are the given specs feasible?
Discussion: No, the space given is reasonably small to accommodate so many wetslips. Need to take into consideration circulation and flow, of vehicular, boat and pedestrian traffic. With the limited space, optimal circulation can not be reached. Possible down sizing? Trailer parking needs a boat wash area, big loops, no backing up, 13’ x 40’, at 120° to the normal, one-way. Spots can be delineated with flush concrete curbing. Other information gained: In today’s society, you no longer need phone lines out on docks, but rather wi-fi. If lamp posts are 20’ high, they need to be 100’ apart. It would be extremely help if the number of expected visitor’s was known, or if we could consult a client.
During this meeting with T&M Associates I was given the opportunity to see working AutoCAD drawings of the proposed Cover Marina in Brick, NJ. Kirk Danielson is the project manager of the marina and was able to explain the general structures and systems of this marina. He had worked on a team of 60 educated professionals to complete the final design. It was of great help to see the design process of a similar project in the real world.
In Class: During lunch Lead structural engineer CC and I proposed to WG a change in specifications. We determined from thorough research and professional advice that a change in specs is needed yet again to complete the project efficiently. Previous specs were just unrealistic. The new specifications were approved. During class a meeting was conducted with the whole of the Green Marina Team to implement the new specifications.
The proposal is as follows:
Concerns/Problems
· 300 slips is too large for given land area – not realistic
· Requires parking which takes up too much space and leaves limited space for everything else
· Lack of optimal circulation and flow of traffic/pedestrians/boaters
Solutions
· Increase land size – not realistic
~OR~
· Sandy Hook caters to day-visitors only
· Beneficial to cater to day-visitors as well, market the marina to people who visit Sandy Hook for day trips– meaning…
· Limiting the marina to smaller sized boats – smaller than 30 ft. (boats the everyday person hauls on a trailer using their own vehicles, large boats require huge diesel trucks to haul)
1. day-visitors of Sandy Hook are usually families
2. smaller boats are more economically feasible to own and use – require less gas, less maintenance, less gas
3. large boats are expensive, costly to maintain and use
4. large boat manufacturers are struggling in today’s economy – no one is buying
· Increasing usage of ramp (for smaller boats up to 24 ft., larger boats require huge trucks and are not hauled in and out of water each day)
1. requires larger amount of parking for trailers
2. requires larger staging area to allow multiple boaters use of ramp at same time
· Decreasing number of slips (to 150)
· Decreasing slip size to less than 30 ft.
· Need optimal circulation and flow – especially for large amounts of pedestrians (Sandy Hook sees over 11,000 visitors each day)
(Upcoming due dates: Model due October 26; redue site layout design for the third time)
Log
Log 2
Date: Friday, October 8
In Class: Continued revising and editing site layout. Having difficulty with flow and circulation of traffic. Spent time after school conversing with WG about feasibility of project.
At Home: Around 4 p.m. visited the Atlantic Highlands Municipal Marina with Lead Structural Engineer CC. Conversed with Harbormaster Bill Bate, Fuel Dock Attendant Bobby Dougherty, and Security Guard Tom Connors. The following information was attained from this mentor contact:
Date: Friday, October 8
In Class: Continued revising and editing site layout. Having difficulty with flow and circulation of traffic. Spent time after school conversing with WG about feasibility of project.
At Home: Around 4 p.m. visited the Atlantic Highlands Municipal Marina with Lead Structural Engineer CC. Conversed with Harbormaster Bill Bate, Fuel Dock Attendant Bobby Dougherty, and Security Guard Tom Connors. The following information was attained from this mentor contact:
Student: Ann Marie Carton
Date: October 8, 2010
Contact: Bill Bate, Bobby Dougherty, Tom Connors
Reference: Specific questions regarding marina parking, fuel logistics, and ramp use.
Type: Visit
Questions: How frequent is the boat ramp used? Size of ramp? How many wetslips does the marina provide? How many moorings? How many gallons of fuel are used? How large are fuel tanks? How many parking spots are available for marina users?
Answers: The ramp on average is used by 40 boaters each day, 60-80 users on weekends and holidays. Ramp is oped 24/7. There are 440 wetslips (18ft. – 130f.) and 172 moorings. There is one 10,000 gallon gas tank, and two 8,000 gallon diesel tanks. Total = 26,000 gallons of fuel. Use 15,000 gallons per average week, weekends and holidays use more. There are a total of 700 available parking spots for all users of the marina.
Other Information: Fuel dock: separate floating dock with pump out station would reduce traffic at fuel dock; retractable hoses and digital pumps are more convenient and efficient; clips on pumps are recommended to shut off flow to prevent spilling; a bathroom on the fuel dock would be convenient; selling ice, cigarettes and alcohol will make money; need ladder and electricity. Miscellaneous: need visitor/transient boat slips; possible dock and dine section; ferry pays marina per foot to use dock; disallow jet skis; water and electricity at each dock.
(Upcoming due dates: Model due October 26)
Thursday, October 28, 2010
Research and Brainstorming: Parking
Parking overview:
- Maximize number of stalls
- Stall and aisle dimensions must be compatible with type of operation planned for the facility
- Dimensions include:
- Stall length
- Aisle width
- Parking angle
- turn radius
- Module - one access aisle servicing a row of parking on each side of the aisle
- Large vehicles are 6' x 17-18'
- small vehicles are 5' x 14-15'
- Aisle width: 12-26' wide (depending on angle stalls are situated)
- Stall width is measured perpendicular to the vehicle
- Sites with slip counts between 125 and 452, 12% of the total storage capacity is the maximum launching ability on a daily basis - of a dry stack facility
- Minimum parking provisions
- 0.6 stalls pe wetslip
- 0.2 stalls per dry storage slip
- 0.5 stalls per marina employees
- 0.2 stalls per mooring
- There are aslo papers that site that there is no universal rule for parking at marinas - any plan needs to take into consideration the location, types of boats berthed, and activities at the marina and adjacent areas
- Wet slip use during boating season on a weekday is 10%-15%, weekend 20% - 30%, holiday weekend 40%-60%
- 1 car parking space for every 2 boat slips is adequate for any national guidelines
- A larger facility will have a smaller percentage of active boaters at the site at anytime as compared to a smaller facility
- Will rarely exceed 60% use
- On average: 0.51 stalls for wet slips, 0.23 stalls for dry storage
- Suggested rates:
- <50 wet slips = 2 slips/1 parking stall
- >50 wet slips = 3 slips/1 parking stall
- live aboards = 1 slip/1 parking space
- Design all spaces for large size vehicles (6' x 18')
Wednesday, October 27, 2010
Research and Brainstorming: Introduction
The task at hand is to design a "Green Marina." My specific role on the Green Marina team is the lead civil engineer. My task is to design and develop the land portion of the civil engineering duties for this "Green Marina" located on the Sandy Hook Peninsula where the chapel curently resides to meet the needs of the marina staff and users. Specific areas of research include environmental building, pollution, parking lot design, site planning, and overall green solutions.
Wednesday, October 6, 2010
Log
Systems Engineering II
Marking Period 1
The Green Marina - Lead Civil Engineer
The log is documented on the blog. It documents and provides insight to daily work done and progress overall during the marking period pertaining to specific tasks I am to perform. Tasks started, worked on and completed are documented in the log. Dates and headings specify work done in class and in home. Reminders of upcoming due dates are documented as well.
Log 1
Date: Wednesday, October 6
In Class: Last Wednesay, Mr. Danko visited our class. The meeting was very productive and informational. Today I began developing a calendar to delineate and schedule tasks in need of completion. I continued refining the orthographic drawings of the site layout due to the sudden change in specifications. The marina is now a 300 boat slip marina, this change positively affected the layout. Less surface area is needed for parking, and more area can be used for landscaping. I believe my solutions for the site layout have come a long way in the last few days compared to last week, but still need more detailed work. I also created and completed a blog post to document progress and daily work through the use of a log.
At Home: Continued work on layout designs. Researched more in depth solutions to paving a parking lot.
(Upcoming due dates: RATIONAL REPORT WAS DUE OCTOBER 1, Model due October 26)
Marking Period 1
The Green Marina - Lead Civil Engineer
The log is documented on the blog. It documents and provides insight to daily work done and progress overall during the marking period pertaining to specific tasks I am to perform. Tasks started, worked on and completed are documented in the log. Dates and headings specify work done in class and in home. Reminders of upcoming due dates are documented as well.
Log 1
Date: Wednesday, October 6
In Class: Last Wednesay, Mr. Danko visited our class. The meeting was very productive and informational. Today I began developing a calendar to delineate and schedule tasks in need of completion. I continued refining the orthographic drawings of the site layout due to the sudden change in specifications. The marina is now a 300 boat slip marina, this change positively affected the layout. Less surface area is needed for parking, and more area can be used for landscaping. I believe my solutions for the site layout have come a long way in the last few days compared to last week, but still need more detailed work. I also created and completed a blog post to document progress and daily work through the use of a log.
At Home: Continued work on layout designs. Researched more in depth solutions to paving a parking lot.
(Upcoming due dates: RATIONAL REPORT WAS DUE OCTOBER 1, Model due October 26)
Tuesday, October 5, 2010
Alternate Solution 1
This solution is designed with respect to the second set of specification and limitations marketed towards all boat users. This set requires the marina to meet the needs of 300wet slip berthing areas and all size boat ramp users while containing the marina within the specified grounds. The marina is responsible for providing necessary facilities, including general parking, ramp user parking, a boat ramp to be used by boats up to 90 feet in length, restrooms, fuel storage, vessel maintenance and repair area, a café, and the harbormaster’s office. Separate buildings house the vessel repair and bathroom facilities. The café and harbormaster’s office are to use one building jointly. These three buildings are each 30’ x 50’. The fuel storage is a specified 40’ x 60’ area to be designed by the Civil Fuel Storage/Pump Engineer.
Entrance to the marina is provided through the ramp area and general user parking areas. The ramp is located in the southern tip of the site. The staging area is roughly 100’ x 100’. After boats are launched, boaters are able to park their vehicles and trailers in the trailer parking lot northwest of the ramp staging area. This parking lot consists of one one-way aisle and 18 13’ x 40’ stalls. It does not allow for pull through parking stalls. The general parking lots can be entered through an access road on the north edge of the site. Each of these parking lots consists of one continuous two-way aisle. The larger of the lots provides 129 stalls. The smaller lot provides 55 stalls. All stalls are 18.5’ x 9’ and are positioned at 90 degrees to the normal.
The ramp staging area and triangular region encompassing the vessel repair building and fuel storage area are to be paved. The parking lots will be surfaced with broken clam shells.
Sunday, October 3, 2010
Subscribe to: