CIVIL STRUCTURES OF THE GREEN MARINA : STEMM INVOLVEMENT
INTRODUCTION
FINAL SOLUTION
As lead civil engineer, the task is to design the civil systems and structures pertaining to the land portion of the. Systems and structures include traffic patterns, entrances and exits, parking lots, facilities, landscaping, storm water runoff control, alternative energy solutions and the overall layout of the site. The chosen solution for the overall layout is seen in Figure 2 and Figure 3. Figure 2, the initial hand drawn solution, has been copied onto a computer generated drawing using Google SketchUp. This solution sports one main entrance and exit, and one side exit positioned opposite the ramp. The center entrance lined with landscaping draws the eye towards the focal point of the site: the octagonal shaped dock structure designed by the lead civil engineer. This center entrance also provides optimal traffic circulation, separating trailers from cars as to alleviate congestion and creating two circular traffic patterns. The traffic pattern to the right is clockwise, and the one to the left is counter clockwise. These circular patterns provide flow throughout the site. The center access road is lined with areas of landscaping to help prevent the road from flooding, but more importantly to help direct runoff away from the shoreline towards inland area. The site provides 33 trailer parking stalls and 121 regular parking stalls for users without boat trailers. Both parking lots and center access road are surfaced with clam shell layers. This large permeable surface complies with Clean Marina Program suggestions. The marina is also equipped with two fuel tanks and a maintenance building located in the bottom right of the site if looking at Figure 3 on the previous page. They are not yet detailed in this picture. The marina also provides bathroom facilities and a harbormaster’s office located near the shoreline. A bulkhead installed on the water’s edge of the site will be filled with backfill to create a flush surface with the rest of the site. This is also known as putting to grade.
SYSTEMS ENGINEERING
This design is an innovation. The concepts of the marina and marina related structures have already been invented. Rather than reinvent, this design intends to innovate these structures and systems to introduce eco-friendly alternatives that suit the site. This innovation, or site plan, is an open system. The system allows energy and mass to pass across the system’s boundaries. The components of the site including the buildings, the parking lots and landscaping areas are components of the system. This site system is a component of a larger system, the marina.
Engineering
The types of engineering involved predominantly in the site design include architectural, civil, construction, environmental, and structural. Architectural engineering will ensure designs and structures are safe, and can hold up the weight of the materials used to build them and endure weather and climate conditions. This pertains to most structures on the sight including buildings and sidewalks. Civil engineering will design, build and inspect the major systems such as the roads, parking lots and ramp. Construction engineering will oversee the construction process, from planning and delivery to production and construction. Environmental engineering will design systems and structures to help protect the environment and produce sustainable outcomes. Environmental engineering plays a large role in all systems designed in for the marina. The parking lot, the rain gardens, the docks, the buildings and all materials used to build these systems will comply with sustainable specifications. Structural engineering, working alongside an architect and the architectural engineer will take plans and figure out the details involving heating, plumbing, framework, electrical and the like.
Manufacturing
The manufacturing methods needed for the design include mass production, the putting-out system and prefabrication. Individual items, such as crushed shell, crushed stones, back fill, concrete, and asphalt will be ordered, delivered and eventually put into place. These items are mass produced. A materials engineer will be employed to research such materials. Prefabrication will be used for the three buildings on site. Components of the structures will be assembled in a factory or other manufacturing site and transported to the construction site. Prefabrication is less invasive to the environment. There is no need to truck in materials and build right on site, which often times uses and harms more land than needed for the actual site. The putting-out system refers to the individual tasks needed to be done rather than materials; man power. This system involves hiring contractors to perform individual tasks or build single structures during construction on the site. For instance, the landscaping will be contracted to a different company than the laying of asphalt will.
Manufacturing categories involved in the design predominately include construction. Construction manufacturing is involved in architecture, civil engineering and the assembling of the infrastructure. The construction is managed by a project manager and supervised by a construction manager, a design manager, construction engineer or project architect. The Energy Industry takes part in the manufacturing process because of the need to sell energy in the form of petroleum and oil at the marina. The renewable energy industry is also involved with the site’s alternative energy solutions. Industrial design is involved with designing the site with respect to the marina user while maintaining optimal function.
SCIENCE CONCEPTS
Clean Marina Concept
The clean marina initiative began through the National Oceanic and Atmospheric Administration (NOAA) and the EPA Coastal Nonpoint Control Program. The Coastal Nonpoint Program was established by Congress in 1990 to ensure that states have the tools to address polluted runoff. The science of addressing runoff includes best management practices of controlling polluted runoff and of pollution prevention. The science behind the clean marina initiative incorporates protecting coastal waters by engaging in environmentally sound operating and maintenance procedures. Again the idea is to use best management practices to reduce and prevent pollution. As explained earlier in this paper, marinas are a nonpoint source polluter. In order to prevent nonpoint source pollution from entering nearby waters and endangering ecosystems, the science of maintaining a clean marina must be instilled. The New Jersey Clean Marina Guidebook, as well as guidebooks from neighboring states has hugely helped this process. When marinas are certified as a Clean Marina, they are awarded with a certificate like the one seen in Figure 4.
Structural Foundations (Integrity)
Structural Integrity has been defined by Dr Steve Roberts (University of Oxford ) as the science and technology of the boundary between safety and disaster. The desire to make money and to have greater returns on investments has driven engineers to design structures and systems with greater structural integrity. The object of increased structural reliability is to design so that under stress of materials structures remain in an unimpaired and complete state. Structural design is coupled with engineering design in that products need to be marketed to purchasers and suppliers. All structures in the marina must be designed with consideration to the sandy sediment and terrain, must be built to withstand dangerous or high-powered weather conditions, and must withstand spray of salt water, bird pollution and dropping of shellfish. Structures and surfaces must be structurally sound and endure all stresses. The Tacoma Narrows Bridge in Figure 5 to the right, for instance was not able to endure high powered winds.
Ergonomics
Ergonomics also known as Human Factors is the scientific concept concerned with the understanding of interactions among humans and other elements of a system, most commonly associated with the work place as shown in Figure 6 on the next page. Ergonomics is related to industrial design in that theory, principles, data and methods are applied to optimize human well-being and system function. User's capabilities and limitations are taken into consideration in seeking to ensure that systems and the environment they are in suit each user. Ancient Greek cultures are coined with using this concept of user efficiency first. Frederick Winslow Taylor in the 19th century created the “Scientific Management” method to find the optimum method for carrying out a task, a form of ergonomics. Ergonomics is related broadly to the user interface of the parking lots designed in the site. Research related to vehicle types, sizes and needed driving area were conducted in order to provide safe and easy travel and parking for marina patrons. The design ensures best fit between the vehicles and travel surfaces. For instance, the general vehicle parking area suits general users. Parking stalls are of optimal size, and provide easy access to key components of the marina. The trailer parking provides optimal space for users with trailers and easy access to the ramp.
Land Surveying
Land surveying is the technique and science of measuring the topography and geography of a piece of land and determining the three-dimensional positions of points on earth’s surface. Surveyors use elements of geometry, engineering, trigonometry, mathematics, physics, law and measuring equipment like the one in Figure 7 to determine these points and the distances and angles between them. Surveying can also be categorized as a detailed inspection in which in depth observations are taken through measurements, questionnaires and other means. The ancient Egyptians were the first to use surveying techniques. When the Nile River flooded its banks, boundaries of where homes were safe from flood waters were established using a surveyor and simple geometry. Minimal land surveying was used on the marina site to determine the slope of the beach front. Six readings were taken in two spots of the site.
TECHNOLOGY INVOLVED
The Internet
Vast and extensive research was conducted during the initial steps of the design process and has continued since. Search engines, digitalized Army Corps of Engineers handbooks, and other pamphlets and standards found on the internet have been the most used technology involved in the design of the solution. The New Jersey Clean Marin Program Guidebook, the programs logo seen in Figure 8, for instance was found on the internet and has guided most of the environmental decisions made during the design process. Other internet documents used were found on New Jersey ’s DEP website.. Other documents used from the internet include The State of California’s Layout & Design Guidelines for Marina Berthing Facilities and also Coastal Zone Management Rules found in New Jersey ’s Administrative Code.
Engineered Porous Pavement
Another technology involved in the design of the final solution was Engineered Porous Pavement. The concept of having permeable surfaces as to prevent unnecessary runoff is pushed strongly by the Clean Marina Hand Book. Impervious surfaces increase runoff of pollutants and toxins into our nearby water ways, threatening not only marine life, but entire marine ecosystems. Permeable pavement allows storm water to flow through the pavement and into the earth’s soil to allow for natural filtration and removal of pollutants. Another scenario, as seen in Figure 9 collects the water in a pipe where it is transported to a nearby retention site. This retention site then acts the same as the soil described above. Surrounding plants and trees will benefit from the water saturated soil as compared to runoff from asphalt into storm drains.
Drainage Systems
Other technology that influenced the design of the marina is multi-phase extraction systems and hull wash wastewater treatment options. This was not included in the task as lead civil engineer but was researched to alleviate pollution from vessel maintenance and runoff. These treatments consist of soil and groundwater management systems. The water filtered through such systems, as seen in Figure 10, is safe to be discharged into the sewer or reused for washing. Technologies used to perform these tasks include filtration, bioremediation, chemicals and electro-coagulation.
Suspended Pavement
Suspended pavement, another technology possibly being used in the final design, involves using a building block for containing unlimited amounts of healthy soil beneath paving while supporting traffic loads and accommodating surrounding utilities as shown in Figure 11. The engineered building block is filled with high-quality, uncompacted soil to grow trees and manage the rate, quality and volume of storm water. The soil under the pavement will naturally act as an underground bioretention system. Through filtration, bioremediation and transpiration storm water will directly be treated. The system can be easily sized to accommodate the needs of any site without compromising effectiveness or site design.
MATHEMATICAL COMPUTATIONS
Parking
General parking is based off of ratios related to the amount of wet slips, dry storage slips, marina employees and number of mornings on a marina site. The parking stall sizes can be seen in Figure 12. Respectively, the ratios are 0.6 parking spaces per wet slip, 0.2 parking spaces per dry storage slip, 0.5 parking spaces per marina employee and 0.2 parking spaces per mooring. Additionally, if a small restaurant was to be built on the site in the future, 0.3 parking spaces would be needed for each seat in the restaurant. The marina site holds only 150 wet slips and no moorings. Approximately 20 employees will be working at the marina. The restaurant will have approximately 50 seats. Taken into account is also the possibility of one live aboard. To find the total number of parking stalls needed, simple multiplication, the sign seen in Figure 13, was used.
Number | Ration | Total | |||
Slips | 150 | x | 0.6 | = | 90 |
Restaurant | 50 | x | 0.3 | = | 12 |
Employees | 20 | x | 0.5 | = | 10 |
Live aboard | 1 | x | 1 | = | 1 |
Total = | 116 |
Required by ADA Compliance regulations, for marinas with a total parking of 101 to 150, there must be a minimum of five accessible spaces. One of the spaces must be designated “van accessible.” This brings the total parking to 121 stalls.
Square Footage
The square footage of the land was calculated using Google Earth. The site was separated into multiple right triangles as seen in Figure 12. The lengths of the sides of the triangles were found using the ruler tool on Google Earth. The areas of each triangle were then calculated using the equation as seen in Figure 13. These areas were then added together to find the total area of the site. This square footage was then divided by 43,560 to find the acreage.
Triangle | Base | Height | Total | ||||
T1 | ½ | x | 472 | x | 202 | = | 47672 |
T2 | ½ | x | 472 | x | 256 | = | 60416 |
T3 | ½ | x | 395 | x | 293 | = | 57867.5 |
T4 | ½ | x | 420 | x | 103 | = | 21630 |
T5 | ½ | x | 127 | x | 81.4 | = | 5180.3 |
Total = | 192765.8 | ||||||
192765.8 | / | 43560 | = | 4.4 acres |
CONCLUSION
The final solution for the layout of the Green Marina Project intends to innovate the concept of the marina structures and systems to introduce eco-friendly alternatives that suit the site. The design is an open system. The types of engineering involved in the design include architectural, civil, construction, environmental, and structural. Manufacturing systems used to create the design will include mass production, the putting-out system and prefabrication. On a broader scale, manufacturing categories used are comprised of construction, the energy industry and industrial design. As discussed earlier, the final solution is a site layout that encompasses one main entrance to bring attention to the focal point – the octagonal dock structure. The layout also provides space for parking, trailer parking, ramp usage, fuel and maintenance storage, and plenty of aesthetic landscaping opportunities. These designs will each follow environmental requirements. The most significant technology used to create this design was by far the internet. The most important technologies used to actually build the site will include environmental ones. The science of ergonomics, and simple geometry also played major roles in the overall design. This project and its final solution reiterate the importance of the design process, and the STEMM fields used to travel through the process.