Monday, February 7, 2011

Midterm: STEMM Report

Ann Marie Carton
Wendy Green, John Cuttrell
Systems Engineering II
21 January, 2011

CIVIL STRUCTURES OF THE GREEN MARINA: STEMM INVOLVEMENT

INTRODUCTION
Marinas are a medium by which to connect society to nature, specifically aquatic nature. Marinas are in sort, a bridge from mother earth to her people. However, a problem lies within this concept.  While succeeding in enjoying nature’s beauty for recreational purposes, marinas succeed in destroying this natural beauty as well.  Marinas cause nonpoint source pollution in neighboring waters by storm water runoff, drips from fuel docks, waste discharges, disposal of fish wastes, and toxic metals released from vessel maintenance. The challenge presented with the Green Marina Project is to design a marina with environmentally friendly requirements utilizing the knowledge and factions related to the STEMM fields: science, technology, engineering, manufacturing and mathematics.  The proposed marina will follow and maintain all practices as set by the New Jersey Clean Marina Program and be designed on a plot of land on the Sandy Hook Peninsula as seen in Figure 1. 

FINAL SOLUTION
As lead civil engineer, the task is to design the civil systems and structures pertaining to the land portion of the.  Systems and structures include traffic patterns, entrances and exits, parking lots, facilities, landscaping, storm water runoff control, alternative energy solutions and the overall layout of the site.  The chosen solution for the overall layout is seen in Figure 2 and Figure 3.  Figure 2, the initial hand drawn solution, has been copied onto a computer generated drawing using Google SketchUp.  This solution sports one main entrance and exit, and one side exit positioned opposite the ramp.  The center entrance lined with landscaping draws the eye towards the focal point of the site: the octagonal shaped dock structure designed by the lead civil engineer.  This center entrance also provides optimal traffic circulation, separating trailers from cars as to alleviate congestion and creating two circular traffic patterns.  The traffic pattern to the right is clockwise, and the one to the left is counter clockwise.  These circular patterns provide flow throughout the site.  The center access road is lined with areas of landscaping to help prevent the road from flooding, but more importantly to help direct runoff away from the shoreline towards inland area.  The site provides 33 trailer parking stalls and 121 regular parking stalls for users without boat trailers.  Both parking lots and center access road are surfaced with clam shell layers.  This large permeable surface complies with Clean Marina Program suggestions.  The marina is also equipped with two fuel tanks and a maintenance building located in the bottom right of the site if looking at Figure 3 on the previous page.  They are not yet detailed in this picture.  The marina also provides bathroom facilities and a harbormaster’s office located near the shoreline.  A bulkhead installed on the water’s edge of the site will be filled with backfill to create a flush surface with the rest of the site.  This is also known as putting to grade.                       

SYSTEMS ENGINEERING
This design is an innovation.  The concepts of the marina and marina related structures have already been invented.  Rather than reinvent, this design intends to innovate these structures and systems to introduce eco-friendly alternatives that suit the site.  This innovation, or site plan, is an open system.  The system allows energy and mass to pass across the system’s boundaries.  The components of the site including the buildings, the parking lots and landscaping areas are components of the system.  This site system is a component of a larger system, the marina. 

Engineering
The types of engineering involved predominantly in the site design include architectural, civil, construction, environmental, and structural.  Architectural engineering will ensure designs and structures are safe, and can hold up the weight of the materials used to build them and endure weather and climate conditions.  This pertains to most structures on the sight including buildings and sidewalks.  Civil engineering will design, build and inspect the major systems such as the roads, parking lots and ramp.  Construction engineering will oversee the construction process, from planning and delivery to production and construction.  Environmental engineering will design systems and structures to help protect the environment and produce sustainable outcomes.  Environmental engineering plays a large role in all systems designed in for the marina.  The parking lot, the rain gardens, the docks, the buildings and all materials used to build these systems will comply with sustainable specifications.  Structural engineering, working alongside an architect and the architectural engineer will take plans and figure out the details involving heating, plumbing, framework, electrical and the like. 

Manufacturing
The manufacturing methods needed for the design include mass production, the putting-out system and prefabrication.  Individual items, such as crushed shell, crushed stones, back fill, concrete, and asphalt will be ordered, delivered and eventually put into place.  These items are mass produced.  A materials engineer will be employed to research such materials.  Prefabrication will be used for the three buildings on site.  Components of the structures will be assembled in a factory or other manufacturing site and transported to the construction site.  Prefabrication is less invasive to the environment. There is no need to truck in materials and build right on site, which often times uses and harms more land than needed for the actual site.  The putting-out system refers to the individual tasks needed to be done rather than materials; man power.  This system involves hiring contractors to perform individual tasks or build single structures during construction on the site.  For instance, the landscaping will be contracted to a different company than the laying of asphalt will. 

Manufacturing categories involved in the design predominately include construction.  Construction manufacturing is involved in architecture, civil engineering and the assembling of the infrastructure.  The construction is managed by a project manager and supervised by a construction manager, a design manager, construction engineer or project architect.  The Energy Industry takes part in the manufacturing process because of the need to sell energy in the form of petroleum and oil at the marina.  The renewable energy industry is also involved with the site’s alternative energy solutions.  Industrial design is involved with designing the site with respect to the marina user while maintaining optimal function.      

SCIENCE CONCEPTS
Clean Marina Concept
The clean marina initiative began through the National Oceanic and Atmospheric Administration (NOAA) and the EPA Coastal Nonpoint Control Program.  The Coastal Nonpoint Program was established by Congress in 1990 to ensure that states have the tools to address polluted runoff.  The science of addressing runoff includes best management practices of controlling polluted runoff and of pollution prevention.  The science behind the clean marina initiative incorporates protecting coastal waters by engaging in environmentally sound operating and maintenance procedures.  Again the idea is to use best management practices to reduce and prevent pollution.  As explained earlier in this paper, marinas are a nonpoint source polluter.  In order to prevent nonpoint source pollution from entering nearby waters and endangering ecosystems, the science of maintaining a clean marina must be instilled.  The New Jersey Clean Marina Guidebook, as well as guidebooks from neighboring states has hugely helped this process.  When marinas are certified as a Clean Marina, they are awarded with a certificate like the one seen in Figure 4.         

Structural Foundations (Integrity)
Structural Integrity has been defined by Dr Steve Roberts (University of Oxford) as the science and technology of the boundary between safety and disaster.  The desire to make money and to have greater returns on investments has driven engineers to design structures and systems with greater structural integrity.  The object of increased structural reliability is to design so that under stress of materials structures remain in an unimpaired and complete state.  Structural design is coupled with engineering design in that products need to be marketed to purchasers and suppliers.  All structures in the marina must be designed with consideration to the sandy sediment and terrain, must be built to withstand dangerous or high-powered weather conditions, and must withstand spray of salt water, bird pollution and dropping of shellfish.  Structures and surfaces must be structurally sound and endure all stresses.  The Tacoma Narrows Bridge in Figure 5 to the right, for instance was not able to endure high powered winds.      

Ergonomics
Ergonomics also known as Human Factors is the scientific concept concerned with the understanding of interactions among humans and other elements of a system, most commonly associated with the work place as shown in Figure 6 on the next page.  Ergonomics is related to industrial design in that theory, principles, data and methods are applied to optimize human well-being and system function. User's capabilities and limitations are taken into consideration in seeking to ensure that systems and the environment they are in suit each user.  Ancient Greek cultures are coined with using this concept of user efficiency first.  Frederick Winslow Taylor in the 19th century created the “Scientific Management” method to find the optimum method for carrying out a task, a form of ergonomics.  Ergonomics is related broadly to the user interface of the parking lots designed in the site.  Research related to vehicle types, sizes and needed driving area were conducted in order to provide safe and easy travel and parking for marina patrons.  The design ensures best fit between the vehicles and travel surfaces.  For instance, the general vehicle parking area suits general users.  Parking stalls are of optimal size, and provide easy access to key components of the marina.  The trailer parking provides optimal space for users with trailers and easy access to the ramp.

Land Surveying
Land surveying is the technique and science of measuring the topography and geography of a piece of land and determining the three-dimensional positions of points on earth’s surface.  Surveyors use elements of geometry, engineering, trigonometry, mathematics, physics, law and measuring equipment like the one in Figure 7 to determine these points and the distances and angles between them.  Surveying can also be categorized as a detailed inspection in which in depth observations are taken through measurements, questionnaires and other means.  The ancient Egyptians were the first to use surveying techniques.  When the Nile River flooded its banks, boundaries of where homes were safe from flood waters were established using a surveyor and simple geometry.  Minimal land surveying was used on the marina site to determine the slope of the beach front.  Six readings were taken in two spots of the site.               
           
TECHNOLOGY INVOLVED
The Internet
Vast and extensive research was conducted during the initial steps of the design process and has continued since.  Search engines, digitalized Army Corps of Engineers handbooks, and other pamphlets and standards found on the internet have been the most used technology involved in the design of the solution.  The New Jersey Clean Marin Program Guidebook, the programs logo seen in Figure 8, for instance was found on the internet and has guided most of the environmental decisions made during the design process.  Other internet documents used were found on New Jersey’s DEP website..  Other documents used from the internet include The State of California’s Layout & Design Guidelines for Marina Berthing Facilities and also Coastal Zone Management Rules found in New Jersey’s Administrative Code.     

Engineered Porous Pavement
Another technology involved in the design of the final solution was Engineered Porous Pavement.  The concept of having permeable surfaces as to prevent unnecessary runoff is pushed strongly by the Clean Marina Hand Book.  Impervious surfaces increase runoff of pollutants and toxins into our nearby water ways, threatening not only marine life, but entire marine ecosystems. Permeable pavement allows storm water to flow through the pavement and into the earth’s soil to allow for natural filtration and removal of pollutants.  Another scenario, as seen in Figure 9 collects the water in a pipe where it is transported to a nearby retention site.  This retention site then acts the same as the soil described above.  Surrounding plants and trees will benefit from the water saturated soil as compared to runoff from asphalt into storm drains.        

Drainage Systems
Other technology that influenced the design of the marina is multi-phase extraction systems and hull wash wastewater treatment options.  This was not included in the task as lead civil engineer but was researched to alleviate pollution from vessel maintenance and runoff.  These treatments consist of soil and groundwater management systems.  The water filtered through such systems, as seen in Figure 10, is safe to be discharged into the sewer or reused for washing.  Technologies used to perform these tasks include filtration, bioremediation, chemicals and electro-coagulation.

Suspended Pavement
Suspended pavement, another technology possibly being used in the final design, involves using a building block for containing unlimited amounts of healthy soil beneath paving while supporting traffic loads and accommodating surrounding utilities as shown in Figure 11. The engineered building block is filled with high-quality, uncompacted soil to grow trees and manage the rate, quality and volume of storm water. The soil under the pavement will naturally act as an underground bioretention system.  Through filtration, bioremediation and transpiration storm water will directly be treated.  The system can be easily sized to accommodate the needs of any site without compromising effectiveness or site design.

MATHEMATICAL COMPUTATIONS
Parking
General parking is based off of ratios related to the amount of wet slips, dry storage slips, marina employees and number of mornings on a marina site.  The parking stall sizes can be seen in Figure 12.  Respectively, the ratios are 0.6 parking spaces per wet slip, 0.2 parking spaces per dry storage slip, 0.5 parking spaces per marina employee and 0.2 parking spaces per mooring.  Additionally, if a small restaurant was to be built on the site in the future, 0.3 parking spaces would be needed for each seat in the restaurant.  The marina site holds only 150 wet slips and no moorings.  Approximately 20 employees will be working at the marina.  The restaurant will have approximately 50 seats.  Taken into account is also the possibility of one live aboard.  To find the total number of parking stalls needed, simple multiplication, the sign seen in Figure 13, was used.


Number

Ration

Total
Slips
150
x
0.6
=
90
Restaurant
50
x
0.3
=
12
Employees
20
x
0.5
=
10
Live aboard
1
x
1
=
1




Total =
116

Required by ADA Compliance regulations, for marinas with a total parking of 101 to 150, there must be a minimum of five accessible spaces.  One of the spaces must be designated “van accessible.”  This brings the total parking to 121 stalls.           

Square Footage
The square footage of the land was calculated using Google Earth.  The site was separated into multiple right triangles as seen in Figure 12.  The lengths of the sides of the triangles were found using the ruler tool on Google Earth.  The areas of each triangle were then calculated using the equation as seen in Figure 13.  These areas were then added together to find the total area of the site.  This square footage was then divided by 43,560 to find the acreage.
 
Triangle


Base

Height

Total
T1
½
x
472
x
202
=
47672
T2
½
x
472
x
256
=
60416
T3
½
x
395
x
293
=
57867.5
T4
½
x
420
x
103
=
21630
T5
½
x
127
x
81.4
=
5180.3






Total =
192765.8








192765.8
/
43560
=
4.4 acres





CONCLUSION
The final solution for the layout of the Green Marina Project intends to innovate the concept of the marina structures and systems to introduce eco-friendly alternatives that suit the site.  The design is an open system.  The types of engineering involved in the design include architectural, civil, construction, environmental, and structural.  Manufacturing systems used to create the design will include mass production, the putting-out system and prefabrication.  On a broader scale, manufacturing categories used are comprised of construction, the energy industry and industrial design.  As discussed earlier, the final solution is a site layout that encompasses one main entrance to bring attention to the focal point – the octagonal dock structure.  The layout also provides space for parking, trailer parking, ramp usage, fuel and maintenance storage, and plenty of aesthetic landscaping opportunities.  These designs will each follow environmental requirements.  The most significant technology used to create this design was by far the internet.  The most important technologies used to actually build the site will include environmental ones.  The science of ergonomics, and simple geometry also played major roles in the overall design.  This project and its final solution reiterate the importance of the design process, and the STEMM fields used to travel through the process.            

Google Earth Elevations

The elevation readings taken from the actual site a few months ago as a team are limited.  Although Google Earth's elevation markings are estimates, I intend to compare both findings to make a better estimate. 

Elevation lines 1-9 (red; starting with the shortest line)

Line 1

Line 2

Line 3

Line 4

Line 5

Line 6

Line 7

Line 8

Line 9

Elevation lines A-C (yellow; perpendicular to the shore starting with the shortest)

Line A

Line B

Line C


Graphics to Assist with Topography

Updated Google Earth Graphics:





Primitive Overlays:




Panorama:







Thursday, February 3, 2011

Log

Log 1
Date: Thursday February 3, 2011

Yesterday in class I continued working on my drawing.  I went over with Ms. Green how to plot the topography of the site. 

Thursday, January 20, 2011

Log

Log 17
Date: Thursday January 20, 2011

IN CLASS:
This week marks the beginning of Formal Progress Update Presentations.  MRu, the civil fueling engineer, presented first on Tuesday.  The exact dimensions of the site needed for the fuel tanks and surrounding berm are not known, but are roughly 45' x 35'.  A fueling truck is able to fill the two 10,000 tanks on either of the short sides of the site.  This is integral information needed to help me with the design of this area.  Today, my counterpart CC (Lead Structural Engineer) presented her work.  A problem involving the bulkhead around the octagonal-shaped dock arose because of a lack of communication between us.  We both assumed different designs without consulting each other.  This will be fixed in the next couple of days. 

I presented my progress thus far on Wednesday.  I have completed a basic site drawing using GoogleSketchUp.  Much work still needs to be completed.  Layers involving dimensions, traffic patterns, rendered details of the ramp area, fuel tank area, side walks, parking lot and buildings, topographical layers and sectionals of the site need to be completed on this drawing.  I have about 70% of my project left to complete.  After these details are completed, I hope to combine drawings with the rest of the team and create 3D drawings of the marina that can be inserted into Google Earth. 

The delivery of my presentation was weak.  I need to project my voice better, extinguish the word "um" from my vocabulary, and work past nerves.  Other than these faults, I believe my presentation went well. 

DUE TOMORROW: STEMM Research Midterm
NEXT WEEK: Midterms
              

Tuesday, January 18, 2011

Thursday, January 13, 2011

Log

Log 16
Date: Thursday January 13, 2011

IN CLASS: Today, my teammates and I recorded mentor contacts that we have performed over the last few weeks throught phone calls.  It was very nice.  After school, CC, HO and I visited Atlantic Highlands Marina to ask some questions and follow up with our progress thus far.  We were able to talk to the Assistant Harbormaster, and he was very helpful.  We gathered information about how the marina became a designated Clean Marina, and proccesses of how the marina is prepared for winter.  This was very nice too.  (Then we went for sushi, it was interesting. I got avocado and cucumber rolls.)

DUE TOMORROW: Mentor Contacts, FPU Outline

Tuesday, January 11, 2011

Log

Log 15
Date: Tuesday January 11, 2011

Today, I started to continue work on my site drawing.  I really hope to finish this soon especially since formal progress update presentations start next week and we are to be virtually finished with our senior project.  I thought this project was to be year long? Halfway through class, I became bored and decided to switch tasks.  I finally asked Mr. Cuttrell for advice on the next step to take with the topography issue.  This issue is many fold.  First of all, we only collected two data points.  This is not enough data to create a realistic topography chart of the land as Ms. Green wished me to.  Second of all, Mr. Cuttrell noticed today that the data collected almost two months ago is inaccurate in someway.  We are not sure what would have caused this.  Still, I must conquer - somehow in someway.  With wrong and too little of data, I still must calculate backfill needed to make our land flat.  This is proving very difficult.  It is essentially a disaster.  I have no faith.

Monday, January 10, 2011

Log

Log 14
Date: Monday January 10, 2011

It is dreary Monday.  I hope snow falls on Wednesday, a snow day would be greatly appreciated.  I am falling behind on work and rest is needed.  Today, MRoy and I graphed the minimal data collected from the topography numbers we collected almost two months ago.  I should have had this done.  Both MRoy and I need to calculate the amount of backfill needed to fill the bulkhead to even the land.  We were at a loss with what to do after we graphed the data.  Both Ms. Green and Mr. Cuttrell left class early to attend meetings so we were unable to ask advice for the next step to take.  But as we were told, this class is independant study. 

Friday, January 7, 2011

Log

Log 13
Date: Friday January 7, 2011

Today, HO, MRay and myself met to discuss the drainage problem concerning the ramp area.  We decided on a drain with grates that would run the width of the ramp and two feet back.  Somehow, this drain would wedge between the ramp and land.  Under the drain would be a pipe running to MRay's drainage system on the other side of the marina.  I am not entirely sure if this is plausible but it is a great start. 

Thursday, January 6, 2011

Log

Log 12
Date: Thursday Janurary 6, 2011

I still continue to work on site drawings.  I have questions about blue-print drawing, however I am afraid to ask them because we are partly being graded on how well we complete our work without asking questions.  Conversed with AB, HO and MRay about landscaping, storm water runoff and drainage.  Tomorrow we plan to meet again with more conclusive ideas about how to deal with the runoff area by the boat ramp.

Monday, January 3, 2011

Log

Log 11
Date: Monday January 3, 2011

HAPPY NEW YEAR! This is the first week back from break, and it seems to be just alright so far. 

Today, we recieved our graded press releases.  Unfortuneately I received and 88.  Points were taken off for each time I used the word "it" and because my pictures were not cited within the paper.  However, my pictures were cited, and I received back the points that were taken off for this discrepancy.  This brought my grade up to a 92.  (Sigh of relief).  I understand for next the next graded writing assignment that I must pay close attention to the specifications of technical writing.  In class, I continue work on my site layout.

P.S. I am finally done with my college applications! 

Thursday, December 23, 2010

Log

Log 10
Date: Thursday December 23, 2010

Today, I did not accomplish much.  It is the last day before winter break, and everyone is in a party mood.  My teammates and I did read an interesting book in Ms. Green's room about birthdays.  A page for each 365 days of the year delineated horoscope-like definitions of personalities related to birth dates.  Surprisingly, the definitions were uncanningly correct.  It was very cool. 

Happy Holidays!

Wednesday, December 22, 2010

Press Release

FOR IMMEDIATE RELEASE


Systems Engineering II: Green Marina
Presentation Announcement

Keeping Sandy Hook Green with Fictional Marina

SANDY HOOK, New Jersey (December 21, 2010) - Students at the Marine Academy of Science and Technology will be presenting Formal Progress Updates on their Senior Capstone Systems Engineering II Projects on January 18, 2011.  

Systems Engineering Given the choice of revolving her senior year of high school around a curriculum of oceanography or engineering, Ann Marie Carton, 17 of Middletown, chose the latter.  Having taken a course in Systems Engineering the year before, Carton thought it wise to continue her interests in this area.  The course she is taking now is Systems Engineering II.  The majority of this course is comprised with a senior capstone project that requires students to work in teams and draw on skills previously learned.
Figure 1: View of Officer's Row From Site
The Green Marina Carton’s senior capstone project is the “Green Marina.”  This project requires students to design a complete set of plans of a fictional but environmentally friendly marina in a given site on the Sandy Hook Peninsula along the Sandy Hook Bay as seen in Figures 1 and 2.  Carton is the Lead Civil Engineer on this project, organizing and overseeing all systems and structures pertaining to the land.  She oversees four other students working on landscape design, storm water runoff management, fuel storage, and alternative energy solutions.  Besides overseeing these students and maintaining eco-friendly standards, one of her specific tasks is to design the overall site layout.  Other aspects of the marina taken under her wing include bathroom facilities, road and parking lot design, vessel maintenance facilities, and dry dock storage.

Figure 2: Area View of Project Site Development
Mentor Involvement The projects undertaken by students in this Systems Engineering II course are quite detailed and require much in depth research and work.  Often times, aspects of the projects require answers most easily attained by professionals rather than independent research.  For this reason, students in this course are required to work closely with a mentor or mentors.  These mentors are found in professional work fields most closely related to the student’s role in their project.  As Lead Civil Engineer, Carton has attained one main mentor, but also contacts a wide range of professionals in marina related work fields.  Her mentors include Kirk B. Danielson, a Principal Landscape Architect at T&M Associates; Bill Bates, Harbormaster at Atlantic Highlands Municipal Marina; and Michael Danko, the writer of the NJ Green Marina Program Handbook.  Carton has been able to answer specific questions about user statistics as well as get much needed feedback on layout designs. 

Formal Progress Update On January 18th Carton will be presenting the work she has completed on her Green Marina thus far in a Formal Progress Update in the presence of her peers and teachers, Wendy Green and John Cuttrell.  This formal presentation will recap the students and teachers on the design problem she faces, and her design brief.  Her design brief states, “Design and develop the land portion of the civil engineering duties for a "Green Marina" located on the Sandy Hook Peninsula where the chapel currently resides to meet the needs of the marina staff and users.” The bulk of the presentation will be spent presenting her final set of drawings and her plans derived from preliminary drawings and a previously made model as seen in Figure 3.  These plans are computer generated using AutoCad and Google SketchUp softwares.

Figure 3: Preliminary Model
STEMM Involvement The STEMM fields, as they are commonly known, encompass the science, technology, engineering, mathematics and manufacturing fields.  These fields are commonly being used in Carton’s Green Marina project.  The most important part of STEMM involved in her project, by nature and by name of the course, is engineering.  She is performing what is known as site planning, a type of engineering.  Also involved in the project is technology.  The base of the project is a set of plans to be created using technology.  The expectations of these designs and marina are as followed: People will use the land portion of the marina through vehicular access.  General visitors, boaters, fishers and workers are able to drive into the marina with limited confusion and be directed properly to the areas related to their needs.  Circulation and flow of vehicular travel in addition to pedestrian travel will be optimal.  Users will be able to easily and readably use all functions of the marina, including walkways, roads, and various facilities.  If users are able to use all functions efficiently and with ease, the civil designs of the marina will be working well.  The marina promises easy use to all users and it must perform at the highest level of functionality.  The end result will perform as an environmentally sustainable site plan for a marina partaking in the NJ Clean Marina Program.  Each structure and system will be built for its intended purpose, but will also take part in environmentally friendly practices.           

What seems like a thesis project for a graduate student in college at quick glance is actually a hands on, team building project for high school seniors like Ann Marie Carton.  Carton has undertaken the role as lead civil engineer in the “Green Marina” Project – a project entailing students to design an eco-friendly marina.  While gaining life skills and experiences, this project teaches students to culminate previously learned skills and create something extraordinary.  On January 18, 2011 a presentation documenting Carton’s progress and that of her peers will be given at the Marine Academy of Science and Technology in Sandy Hook, NJ.
 
For more details about The Green Marina in Sandy Hook, contact Ann Marie Carton at amcarton@gmail.com or visit The Marine Academy of Science and Technology at mast.mcvsd.org.

About the Marine Academy of Science and Technology
The Marine Academy of Science and Technology (MAST) is a co-ed four-year high school, grades 9-12; one of five career academies administered by the Monmouth County Vocational School District. The Marine Academy is fully accredited by the Middle States Association of Schools and Colleges and offers small classes with close personal attention. The Marine Academy was founded in 1981 as a part-time program, which has since grown to become a full-time diploma-granting program. The school's curriculum focuses on marine sciences and marine technology/engineering. The MAST program requires each student to participate in the Naval Junior Reserve Officer Training Corps (NJROTC) in lieu of Physical Education.
MAST is located in the Fort Hancock Historic Area at the tip of Sandy Hook, New Jersey. The school campus is located adjacent to the Sandy Hook Lighthouse, the oldest working lighthouse in the country, in thirteen newly renovated buildings, within walking distance of several beaches. The "Blue Sea" is a 65-foot research vessel owned and operated by the Marine Academy and berthed at the U.S. Coast Guard Station, Sandy Hook. The vessel is used in all facets of the program.
- # # # -
For additional information:
Marine Academy of Science and Technology
Ann Marie Carton, E: ann_marie_carton@mast.mcvsd.org
Wendy Green and John Cuttrell, V: 732-291-0995

Log

Log 9
Date: Wednesday December 22, 2010

Over the weekend I finally finished my press release, and did some revising and picture editing on Monday (Ms. Green's Birthday!).  However, yesterday I was not feeling too well and I did not attend school.  I was not able to hand in my press release, and I also missed a really hard AP physics test.  Today, I handed in my press release.  I really hope it is completed well.  I am very nervous. 

Friday, December 17, 2010

Log

Log 8
Date: Friday December 17, 2010

IN CLASS: Majority of my class time spent working on the press release today, and awakening my technical writing skills from freshman year.  It is due very soon!

On Wednesday, CC, MD and myself conference called Jim Courtney of Atlantic Dock and Bulkhead Co. to ask some questions about bulkhead design and construction. 

Tuesday, December 14, 2010

Log

Log 7
Date: Tuesday December 14, 2010

IN CLASS: I still continue to work on my drawings on GoogleSketch Up.  This is getting monotenous.  CC, my counterpart, has finished her preliminary drawings for the structural part of the marina.  I feel slow.  Luckily, there is another assignment I have began to work on.  This is the press release.  It is due in about a week on December 21st.  Progress is also being made with the landscaping and water drainage portions of the project.  I have been consulting these two members on the team regularly now, making these portions of the project run much more cohesively.   

Thursday, December 9, 2010

Log

Log 6
Date: Thursday December 9, 2010

IN CLASS: I yet again continue on the layout drawings.  I am having difficulty with making things perfect on GoogleSketch Up.  I have, on a positive note, have changed the configuration of the trailer parking lot to accomodate more stalls.  Originally the parking lot could hold 28 cars with boat trailers up to forty feet in length.  Now the parking lot can accomodate 33 cars and trailers.  One of the sizes of the grass/landscaping medians changed minimally.     

It is really dragging on, but I need to complete them soon.  As a team we are starting to run into troubles because my final drawings are not done.

Tuesday, December 7, 2010

Log

Log 5
Tuesday December 7, 2010

Today, I continued working on my GoogleSketch Up drawing of the overall layout.  For now, the layout is very basic.  I hope to get drawing on the details of the site soon, such as individual parking stalls and surface gradiant.  Eventually I hope to finish a detailed drawing complete with realistic colors, and create a 3D drawing with the rest of the marina. 

But, I have so much work to do.  Honestly, I feel completely unmotivated and I don't know what to do about it.

Thursday, December 2, 2010

Log

Log 4
Date: Thursday December 2, 2010

In Class: I continue to work on the site drawing using GoogleSketchUp.  Its working out well.  The dimensions of the islands in the trailer parking lot have been changed minimally.  Landscape engineer has been consulted.