Log 13
Date: Friday January 7, 2011
Today, HO, MRay and myself met to discuss the drainage problem concerning the ramp area. We decided on a drain with grates that would run the width of the ramp and two feet back. Somehow, this drain would wedge between the ramp and land. Under the drain would be a pipe running to MRay's drainage system on the other side of the marina. I am not entirely sure if this is plausible but it is a great start.
No comments:
Post a Comment