Friday, January 7, 2011

Log

Log 13
Date: Friday January 7, 2011

Today, HO, MRay and myself met to discuss the drainage problem concerning the ramp area.  We decided on a drain with grates that would run the width of the ramp and two feet back.  Somehow, this drain would wedge between the ramp and land.  Under the drain would be a pipe running to MRay's drainage system on the other side of the marina.  I am not entirely sure if this is plausible but it is a great start. 

No comments:

Post a Comment