Log 17
Date: Thursday January 20, 2011

IN CLASS:
This week marks the beginning of Formal Progress Update Presentations.  MRu, the civil fueling engineer, presented first on Tuesday.  The exact dimensions of the site needed for the fuel tanks and surrounding berm are not known, but are roughly 45' x 35'.  A fueling truck is able to fill the two 10,000 tanks on either of the short sides of the site.  This is integral information needed to help me with the design of this area.  Today, my counterpart CC (Lead Structural Engineer) presented her work.  A problem involving the bulkhead around the octagonal-shaped dock arose because of a lack of communication between us.  We both assumed different designs without consulting each other.  This will be fixed in the next couple of days. 

I presented my progress thus far on Wednesday.  I have completed a basic site drawing using GoogleSketchUp.  Much work still needs to be completed.  Layers involving dimensions, traffic patterns, rendered details of the ramp area, fuel tank area, side walks, parking lot and buildings, topographical layers and sectionals of the site need to be completed on this drawing.  I have about 70% of my project left to complete.  After these details are completed, I hope to combine drawings with the rest of the team and create 3D drawings of the marina that can be inserted into Google Earth. 

The delivery of my presentation was weak.  I need to project my voice better, extinguish the word "um" from my vocabulary, and work past nerves.  Other than these faults, I believe my presentation went well. 

DUE TOMORROW: STEMM Research Midterm
NEXT WEEK: Midterms
              