Wednesday, March 2, 2011

Log

Log 8
Date: Wednesday March 2, 2011

IN CLASS: The problem surrounding the ramp/bulkhead/drain area was solved.  The bulkhead stops at the ramp, which allows the drain to be flush with the ramp.  Also, today I learned how to create terrain by using the sandbox controls and/or using contour lines.  This is very beneficial to the final 3D drawing.  I continue adding details such as cross sections and page details.  Construction of the model will begin next week. 

No comments:

Post a Comment